01Pre-drywall / open-stud inspectionLook while the work
is still visible.
Once drywall is installed, much of the rough-in work is concealed. Coordinate access with your builder after the relevant framing and mechanical, electrical, and plumbing rough-ins are ready, before insulation and wall coverings conceal them.
- Visible framing conditions, connections, and penetrations.
- Accessible plumbing, electrical, and HVAC rough-ins.
- Visible moisture-management details at accessible openings and exterior components.
- Documented observations to discuss with your builder before the next stage.
The exact timing depends on construction progress and builder access. This is a visual inspection, not engineering design review or code certification.
What about a seven-year warranty?Longer protection depends on the documents.
Some builders or warranty providers offer longer structural coverage. The duration, covered components, exclusions, and notice requirements depend on your written warranty. There is no blanket seven-year builder warranty for every Florida home.
Florida law provides a limited one-year builder warranty for qualifying newly constructed homes under section 553.837. Separately, section 95.11 sets time limits on construction-related legal actions, including a seven-year outer deadline in specified circumstances. That deadline is not a repair warranty.
Have a concern now? Do not wait for a calendar milestone. Check your warranty, notify the appropriate party promptly, and seek specialist or legal guidance where needed. We document observed conditions; we do not determine legal deadlines or warranty eligibility.